PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Men's Room 133 underground plumbing Facing North-East (800x600).jpg Securing the shear wall panels at Stair -4 (4th Floor) Facing North-East (800x600).jpg Started Backfilling and compacting the Electrical and the Sprinklers Room Facing South-East (800x600).jpg Started stripping the shear wall panels at Elev. 4-Stair -2 (4th Floor) Facing South-West (800x600).jpg Backfilling and compacting on the left side of the bridge by the Administration Building (800x600).jpg Finished installing the conduit for the Tele-Data at the bridge by the Administration Building  (800x600).jpg Pulling strings for the Tele-Data wires at the manhole (800x600).jpg Stripping the shear wall panels at Elev. 4-Stair -2 (4th Floor) Facing South (800x600).jpg
Previous pageNext page Backfilling and compacting on the left side of the bridge by the Administration Building (800x600)
Backfilling and compacting on the left side of the bridge by the Administration Building (800x600)